How To Order and Terms and Definitions

 

New to ordering a Custom Bow String?

BSD would like to help!!

Here is some info you will need and need to understand.

In ordering a new string set you will need to have the following info on hand.

1. Make of bow. examples: Hoyt, Matthews, Pse, Elite etc.

2. Model of bow. Examples: (Pse) Brute, (Matthews) Chill x etc.

3. Year if possible. But not always necessary

4. You will need to know what string set style you have.
Single cam (1 string,1 buss cable)
Dual cam (1 string 2 buss cables)
Binary cam (1 string 2 control cables)
Hybrid cam (1 string 1 buss 1 control) 
Also 5piece set (1 string, 2 yokes, 2 controls)
7 piece set(1 string, 4 yokes, 2 controls)

5. You will need to know, String length, Yoke length, Cable length, Buss length these are usually found on a limb sticker on the bottom limb close to the riser. In some cases your draw length will help in finding the lengths 

Lengths:

String and cable lengths are usually found on the bottom limb sticker for most compound bows. Traditional are marked on the bow and its AMO length. 

 

Buss Cable:

Split at one end and fitted to each side of the limb and straight at the other end connected to cam

 

Cables:

Cables are  straight and fit from cam to cam

 

Pinstripe: 

One strand of a contrasting color in between the two color chosen

 

Serving 3d:  

A serving that is twisted together.

 

Halo:

 A serving that is braided together

 

Cat Whiskers:  

Are for quieting the bowstring down and are very effective

 

Speed nocks: 

Are brass nocks with a shrink tubing over them and they are installed for speed by the manufacturer.

 

TPU speed nocks:  

Are a sleeve that slide over the string and take place of the brass speed nocks

 

Cable Containment system or Roller guard system:

 A roller that contains the cable or back of the string from  moving forward or backwards it only allows it to roll up or down

 

 

String Material:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Monday thru Friday Estimated Build Time days 

Need it fast! give us a call 603-267-8219                                                         

                                                        

"